11 December 2022 at 10:18 The opening of the Folloban was affected by signal problems On Sunday morning, the new Folloban opened between Ski and Oslo. But on Sunday morning, the trains had to run at a reduced speed on the route after a signal error. The trains from Ski in the direction of Oslo had to run at a reduced speed through the Blixtunnel for a quarter of an hour just before 10 o’clock on Sunday morning, as a result of a signal error. The signal error has now been corrected. (NTB)
ttn-69