{"id":1706068,"date":"2025-05-07T17:09:26","date_gmt":"2025-05-07T17:09:26","guid":{"rendered":"https:\/\/teknomers.com\/es\/roma-thermovalizer-el-final-final-en-acea-sitios-de-construccion-para-el-verano\/"},"modified":"2025-05-07T17:09:31","modified_gmt":"2025-05-07T17:09:31","slug":"roma-thermovalizer-el-final-final-en-acea-sitios-de-construccion-para-el-verano","status":"publish","type":"post","link":"https:\/\/teknomers.com\/es\/roma-thermovalizer-el-final-final-en-acea-sitios-de-construccion-para-el-verano\/","title":{"rendered":"Roma Thermovalizer, el final final en Acea: Sitios de construcci\u00f3n para el verano"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div>\n<p><button class=\"aembed-audio \" type=\"button\" id=\"audioReadingButton\"><span class=\"icon icon-listen-small icon--status\"\/>Escuche la versi\u00f3n de audio del art\u00edculo<\/button><\/p>\n<p class=\"atext\">Ha llegado la tarea. Ayer, Roma Capitale anunci\u00f3 que hab\u00eda otorgado definitivamente la agrupaci\u00f3n de empresas dirigidas por Acea Ambiente con Suez Italia, Kanadevia Innova (ex Hitachi Zosen), Vianini y RMB la construcci\u00f3n de la termosidad en el \u00e1rea industrial de Santa Palomba, en la frontera con Pomezia. El \u00e1lbum verde, recibido con satisfacci\u00f3n por el alcalde <b>Roberto Gualtieri<\/b> y por el CEO de ACEA, <b>Fabrizio Palermo<\/b>se encendi\u00f3 despu\u00e9s de la validaci\u00f3n t\u00e9cnica del proyecto por parte de la compa\u00f1\u00eda de certificaci\u00f3n a cargo.<\/p>\n<p><h2 id=\"U28842476157FUj\">El contrato de concesi\u00f3n se firm\u00f3 durante 33 a\u00f1os<\/h2>\n<\/p>\n<p class=\"atext\">La administraci\u00f3n y renovaci\u00f3n de la capitolina, la compa\u00f1\u00eda que administrar\u00e1 la planta durante los pr\u00f3ximos 33 a\u00f1os (que consiste en Acea Ambiente con una participaci\u00f3n del 57%, desde Suez hasta el 30%, desde Kanadevia innovada hasta 9.9%, desde Vianini hasta 3%y de RMB a 0.1%) y que est\u00e1 dirigida por <b>Barbara Maccioni<\/b> En el papel de administrador, firmaron el contrato de concesi\u00f3n.<\/p>\n<p><h2 id=\"U17855707246nxL\">El procedimiento de autorizaci\u00f3n regional \u00fanica comenzar\u00e1 en una gira estricta<\/h2>\n<\/p>\n<p class=\"atext\">Despu\u00e9s de muchas expectativas y algunos obst\u00e1culos, comenzando con las apelaciones al poder judicial hasta ahora, todos rechazados, una vena que no parece destinada a agotarse, con los municipios de Pomezia, Ardea, Marino y Ariccia que ha anunciado la intenci\u00f3n de recurrir al Tribunal Europeo de Justicia, por lo tanto, el proceso ingresa al coraz\u00f3n. El procedimiento de autorizaci\u00f3n regional \u00fanico se iniciar\u00e1 en breve, que ser\u00e1 administrado por la estructura del comisionado, porque el alcalde de la capital, como comisionado extraordinario para el Jubileo, tambi\u00e9n se atribuy\u00f3 el poder de adopci\u00f3n del plan de gesti\u00f3n de residuos de la ciudad y de aprobaci\u00f3n de los proyectos de nuevas plantas.<\/p>\n<p><h2 id=\"U62166163421ZfW\">Los sitios de construcci\u00f3n se abrir\u00e1n para el verano.<\/h2>\n<\/p>\n<p class=\"atext\">La apertura de los sitios de construcci\u00f3n est\u00e1 programada para el verano y, si se respeta la hoja de ruta, el termalizer ya podr\u00eda estar listo para fines de 2027. Seg\u00fan el proyecto, que hab\u00eda sido ilustrado el 14 de octubre por Gualtieri junto con Palermo, el sistema: una parte integral del plan de desechos lanzado en 2023, tambi\u00e9n implica alcanzar el 70% de las diferenciadas por 2035, podr\u00e1 recibir 600 tons de 600 Tons de 600 Tons de 600 Tons de 600 T. Los desechos indiferenciados y no reciclables cada a\u00f1o, se transferir\u00e1 por transferir para transferirse a trav\u00e9s de Rotaia y contemplar\u00e1 un parque de la econom\u00eda circular, un \u00e1rea equipada con investigaci\u00f3n y espacios de coworking, un invernadero, un jard\u00edn p\u00fablico y una torre panor\u00e1mica de m\u00e1s de 70 metros de altura.<\/p>\n<aside class=\"acor acor--mkt\">\n<div class=\"row row--dotted\">\n<div class=\"col-md-6\"><a rel=\"nofollow noopener\" class=\"aprev aprev--acor aprev--acor-small aprev--shline\" href=\"https:\/\/minisiti.ilsole24ore.com\/intelligenza-artificiale\/\" target=\"_blank\"><\/p>\n<figure class=\"aprev-img\"><\/figure>\n<p><\/a><\/div>\n<div class=\"col-md-6\"><a rel=\"nofollow noopener\" class=\"aprev aprev--acor aprev--acor-small aprev--shline\" href=\"https:\/\/tariffe.ilsole24ore.com\/\" target=\"_blank\"><\/p>\n<figure class=\"aprev-img\"><img decoding=\"async\" class=\"img-fluid\" src=\"https:\/\/teknomers.com\/es\/wp-content\/uploads\/2025\/05\/Terna-de-Saving-Network-a-Maquinas-de-Ojos-digitales-aqui.png\" alt=\"Descubre m\u00e1s\"\/><\/figure>\n<p><\/a><\/div>\n<\/div>\n<\/aside>\n<p><h2 id=\"U47604524264KLf\">Cuatro sistemas auxiliares e impacto ambiental reducido al m\u00ednimo<\/h2>\n<\/p>\n<p class=\"atext\">Junto con la estructura principal, se construir\u00e1n cuatro sistemas auxiliares para la recuperaci\u00f3n de cenizas pesadas, producci\u00f3n fotovoltaica, una red de calefacci\u00f3n de distrito y un sistema experimental para la captura del CO\u2082. La promesa, anticipada en octubre, es la de una planta de desechos a la energ\u00eda capaz de garantizar un impacto ambiental muy contenido: las emisiones ser\u00e1n claramente m\u00e1s bajas que los l\u00edmites establecidos por las Directivas Europeas y las mejores t\u00e9cnicas disponibles (BAT) y la contaminaci\u00f3n causada por el tr\u00e1fico de una carretera. El sistema producir\u00e1 energ\u00eda t\u00e9rmica y el\u00e9ctrica (65 MW en general) suficiente para alimentar a unas 200 mil familias y permitir\u00e1 la recuperaci\u00f3n de aproximadamente 10 mil toneladas de acero, 2 mil aluminio y 1.600 cobre cada a\u00f1o.<\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.ilsole24ore.com\/art\/termovalorizzatore-roma-si-finale-ad-acea-cantieri-entro-l-estate-AHYP1Zd\" rel=\"nofollow noopener\" target=\"_blank\">ttn-es-11<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Escuche la versi\u00f3n de audio del art\u00edculo Ha llegado la tarea. Ayer, Roma Capitale anunci\u00f3 que hab\u00eda otorgado<\/p>\n","protected":false},"author":1,"featured_media":1706069,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[132471,312,463,18,1273,3260,305059,3029],"class_list":["post-1706068","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tecnologia","tag-acea","tag-construccion","tag-final","tag-para","tag-roma","tag-sitios","tag-thermovalizer","tag-verano"],"_links":{"self":[{"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/posts\/1706068","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/comments?post=1706068"}],"version-history":[{"count":0,"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/posts\/1706068\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/media\/1706069"}],"wp:attachment":[{"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/media?parent=1706068"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/categories?post=1706068"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teknomers.com\/es\/wp-json\/wp\/v2\/tags?post=1706068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}