{"id":227656,"date":"2026-05-30T06:12:45","date_gmt":"2026-05-30T06:12:45","guid":{"rendered":"https:\/\/teknomers.com\/en\/the-ave-to-extremadura-takes-a-significant-step-in-strengthening-its-connection-with-madrid-a-decade-in-the-making\/"},"modified":"2026-05-30T06:12:47","modified_gmt":"2026-05-30T06:12:47","slug":"the-ave-to-extremadura-takes-a-significant-step-in-strengthening-its-connection-with-madrid-a-decade-in-the-making","status":"publish","type":"post","link":"https:\/\/teknomers.com\/en\/the-ave-to-extremadura-takes-a-significant-step-in-strengthening-its-connection-with-madrid-a-decade-in-the-making\/","title":{"rendered":"The AVE to Extremadura Takes a Significant Step in Strengthening Its Connection with Madrid: A Decade in the Making."},"content":{"rendered":"\n<div>\n<p>They say that things in the palace go slowly. We could say the same about high speed. Not only because &#8220;high-speed&#8221; trains are taking longer than ever, but also because the construction of each new line resembles a birth that lasts decades.<\/p>\n<p><!-- BREAK 1 --> <\/p>\n<p>For example, the AVE to Extremadura. A quarter of a century has now passed since the project was approved. 25 years. And what we continue to have are connections typical of the 70s until we enter Extremadura where, coincidentally, the pace is already accelerating past C\u00e1ceres.<\/p>\n<p>We don&#8217;t lie. In 1970, whoever took a train to Extremadura would arrive at the current Monfrag\u00fce station in 181 minutes. Today, if everything goes well, it will only take 20 minutes less. More than half a century later, it still takes more than three hours to get from Madrid to Plasencia. Currently, you must stop at Monfrag\u00fce station and take a bus since the train no longer goes there.<\/p>\n<p><!-- BREAK 2 --><\/p>\n<p>At least, in Extremadura, they can boast of having C\u00e1ceres and Badajoz connected since last December by high speed. It is now possible to cover the journey in just 50 minutes, thanks to long-awaited works that have finally been completed.<\/p>\n<p>A milestone that Castilla-La Mancha cannot claim. Following 25 years of deliberations on where the AVE will pass on its way to Lisbon, a new step forward has been taken. However, this step also feels reminiscent of nearly ten years ago.<\/p>\n<p><!-- BREAK 3 -->  <\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\"><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<h2>One Step Forward, Toledo. One Step Back<\/h2>\n<p>When the AVE was initially planned to connect Madrid with Extremadura, it was decided the work would have two clearly differentiated sections: Madrid-Oropesa and Talayuela-C\u00e1ceres.<\/p>\n<p>Despite significant delays, the Talayuela-C\u00e1ceres section is nearing completion, enabling high-speed trains in that region. According to a recent review from <em>Today<\/em>, the project\u2019s end could have been much closer if the La Mancha section had progressed at a similar pace.<\/p>\n<p><!-- BREAK 4 --><\/p>\n<p>Since 2008, discussions about the AVE&#8217;s passage through Toledo have slowed progress. Initially, an environmental impact report was approved, which included a connection with the Andalusian corridor next to Pantoja. The aim was to extend the line towards Extremadura and reduce costs.<\/p>\n<p><!-- BREAK 5 --><\/p>\n<p>However, the works never began. The 2008 economic crisis derailed the project, and the environmental report expired. By 2017, the Ministry of Public Works proposed that the AVE should pass through Toledo, believing this would attract more travelers due to the city&#8217;s status as a World Heritage Site. However, this change increased travel distance and time.<\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\">\n     <img loading=\"lazy\" decoding=\"async\" alt=\"&quot;The train to Extremadura... let Renfe take it&quot;: the Government's hopeless lament against railway liberalization\" width=\"375\" height=\"142\" src=\"https:\/\/teknomers.com\/en\/wp-content\/uploads\/2026\/05\/1780121565_382_The-AVE-to-Extremadura-Takes-a-Significant-Step-in-Strengthening.jpeg\"\/>\n   <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p>The plan faced rejection from local authorities. The proposed AVE would theoretically connect to the existing station, which is merely two kilometers from Toledo&#8217;s city center. However, building a necessary viaduct to cross the Tagus has met with local resistance, as officials fear it would detract from the city\u2019s charm.<\/p>\n<p><!-- BREAK 7 --><\/p>\n<p>By 2020, the project had evolved into subdividing the line into four sections: Toledo, Torrijos, Talavera de la Reina, and Oropesa. Pushback from local authorities in Torrijos further complicated the plan, leading to additional studies extending into 2022. Although Toledo eventually agreed to subsequent proposals, their overall approval remains elusive.<\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\">\n     <img loading=\"lazy\" decoding=\"async\" alt=\"In the 19th century, Spain made the strange decision to build its roads in Iberian gauge. Now they are going to be a gift for Renfe in Galicia \" width=\"375\" height=\"142\" src=\"https:\/\/teknomers.com\/en\/wp-content\/uploads\/2026\/05\/1780121565_384_The-AVE-to-Extremadura-Takes-a-Significant-Step-in-Strengthening.jpeg\"\/>\n   <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p>In a bid to expedite the project, the Ministry of Transport has approved a new study proposing to create two branches from the Andalusian corridor. If this plan progresses, it will originate from Pantoja (as was initially intended) and involve both Iberian gauge and international gauge trains. However, trains capable of making this transition would be necessary since the rest of the route to Extremadura is on Iberian gauge.<\/p>\n<p><!-- BREAK 8 --><\/p>\n<p>Currently, the discussions seem to echo conclusions reached back in 2008, remaining unresolved since until a firm decision about the AVE to Extremadura\u2019s route through Toledo is made.<\/p>\n<p><!-- BREAK 9 --><\/p>\n<p>Photo credits: <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/unsplash.com\/es\/fotos\/edificios-durante-el-dia-Q76ZNGeBkTw\" target=\"_blank\">Gunnar Ridderstr\u00f6m<\/a>, <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/unsplash.com\/es\/s\/fotos\/toledo\" target=\"_blank\">Jaime Lillo<\/a>, and <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/commons.wikimedia.org\/wiki\/Category:Renfe_Class_103#\/media\/File:S02_773_Bf_Madrid_Atocha,_103,_130.jpg\" target=\"_blank\">Falk2<\/a><\/p>\n<p>In Xataka | The theory said that the entry of the AVE into Galicia would plummet aircraft prices. Practice is something else.<\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/teknomers.com\/category\/general\/\" rel=\"dofollow\">General News &#8211; 2<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>They say that things in the palace go slowly. We could say the same about high speed. Not only because &#8220;high-speed&#8221; trains are taking longer than ever, but also because the construction of each new line resembles a birth that lasts decades. For example, the AVE to Extremadura. A quarter of a century has now [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":227657,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36399],"tags":[30411,1770,24226,38433,7494,7057,8831,1276,7894,1375],"class_list":["post-227656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology","tag-ave","tag-connection","tag-decade","tag-extremadura","tag-madrid","tag-making","tag-significant","tag-step","tag-strengthening","tag-takes"],"_links":{"self":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/227656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/comments?post=227656"}],"version-history":[{"count":1,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/227656\/revisions"}],"predecessor-version":[{"id":227658,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/227656\/revisions\/227658"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media\/227657"}],"wp:attachment":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media?parent=227656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/categories?post=227656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/tags?post=227656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}