{"id":221614,"date":"2026-05-05T00:47:48","date_gmt":"2026-05-05T00:47:48","guid":{"rendered":"https:\/\/teknomers.com\/en\/96-beams-500-ton-cranes-and-night-work-madrid-places-the-final-piece-of-the-park-above-the-m-30\/"},"modified":"2026-05-05T00:47:50","modified_gmt":"2026-05-05T00:47:50","slug":"96-beams-500-ton-cranes-and-night-work-madrid-places-the-final-piece-of-the-park-above-the-m-30","status":"publish","type":"post","link":"https:\/\/teknomers.com\/en\/96-beams-500-ton-cranes-and-night-work-madrid-places-the-final-piece-of-the-park-above-the-m-30\/","title":{"rendered":"96 Beams, 500-Ton Cranes, and Night Work: Madrid Places the Final Piece of the Park Above the M-30"},"content":{"rendered":"\n<h2>Progress on Parque Ventas in Madrid<\/h2>\n<p>The construction of Parque Ventas in Madrid is achieving its milestones, having successfully placed the <strong>96 beams<\/strong> that support the structural platform of this innovative park over the M-30 highway. This project aims to connect the Salamanca and Ciudad Lineal districts, which have been divided by the busy highway for decades.<\/p>\n<h3>Meeting Construction Deadlines<\/h3>\n<p>Ten months into the construction, the supporting structure is now complete. <strong>Paloma Garc\u00eda Romero<\/strong>, the delegate of the Works and Equipment Area of the Madrid City Council, has confirmed that the last beam has been placed and that roofing work is already in progress. Additionally, the first of the <strong>eight walkways<\/strong> providing access to the park has been connected. The project timeline remains on track for a spring 2027 opening.<\/p>\n<h3>Key Statistics<\/h3>\n<p>Parque Ventas features a <strong>platform<\/strong> measuring <strong>197 meters long<\/strong> and encompassing <strong>16,370 m\u00b2<\/strong>. This new green space will soar above the <strong>16 lanes of the M-30<\/strong>, the most heavily trafficked section of highway in Spain, accommodating about <strong>150,000 vehicles daily<\/strong> in each direction.<\/p>\n<h3>Construction Techniques<\/h3>\n<p>The structure is anchored on piles that extend between <strong>16 and 17 meters deep<\/strong>. The <strong>96 prefabricated prestressed reinforced concrete beams<\/strong> are arranged in <strong>32 transverse frames<\/strong>, supported by platform edges and median piles separating the main and auxiliary lanes. A <strong>30-centimeter thick concrete slab<\/strong> is being laid on top of these beams, while the total deck reaches a depth of <strong>2.7 meters<\/strong>, with a soil layer of <strong>1.5 meters<\/strong> to facilitate landscaping.<\/p>\n<h3>Logistical Challenges<\/h3>\n<p>The assembly of these beams requires meticulous planning and execution. Javier N\u00e1jera, head of the City Council&#8217;s structures service, mentioned that daytime construction could cause delays of up to <strong>14 hours<\/strong>. As a result, key operations have been focused during the summer evenings when traffic decreases by <strong>40%<\/strong>. Heavy cranes weighing over <strong>500 tons<\/strong> were utilized, with all equipment needing to be cleared by <strong>6 a.m.<\/strong> each day.<\/p>\n<p>The beams, some weighing up to <strong>200 tons<\/strong> and measuring <strong>40 meters in length<\/strong>, were transported from <strong>Rivas Vaciamadrid<\/strong> and <strong>Seville<\/strong>, as manufacturing all within Madrid was not feasible for the necessary pace.<\/p>\n<h3>Future Features of the Park<\/h3>\n<p>Upon completion, Parque Ventas will offer a vibrant green space with pedestrian areas, gardens featuring <strong>591 trees<\/strong> and over <strong>48,800 bushes<\/strong>, along with <strong>children&#8217;s playgrounds<\/strong>, calisthenics equipment, a small grandstand for performances, kiosks, and fountains. The <strong>eight walkways<\/strong> will establish a green corridor between <strong>Quinta de la Fuente del Berro park<\/strong> and the green spaces of Ciudad Lineal.<\/p>\n<h3>Community Concerns<\/h3>\n<p>While the project is advancing, it has not been without complaints. The <strong>AfectadosM30 community group<\/strong> has expressed concerns about the impact of nighttime construction on over <strong>50,000 residents<\/strong> in the area. They have also raised issues regarding <strong>underground water<\/strong> discoveries during excavation and questioned the project&#8217;s overall cost.<\/p>\n<p>The City Council estimates the total investment at <strong>80 million euros<\/strong>, but the community group claims that adjustments made post-initial awarding raise it to <strong>94.9 million euros<\/strong>.<\/p>\n<h3>Next Steps<\/h3>\n<p>With the structural phase completed, the focus is now on laying the concrete slab, developing the roof, and implementing waterproofing and drainage systems. Following these tasks, landscaping will commence to bring the park to life.<\/p>\n<p><br \/>\n<br \/><a href=\"https:\/\/teknomers.com\/category\/general\/\" rel=\"dofollow\">General News &#8211; 2<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Progress on Parque Ventas in Madrid The construction of Parque Ventas in Madrid is achieving its milestones, having successfully placed the 96 beams that support the structural platform of this innovative park over the M-30 highway. This project aims to connect the Salamanca and Ciudad Lineal districts, which have been divided by the busy highway [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":221615,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36399],"tags":[51993,51992,39101,466,44946,7494,384,1424,6362,1045,319],"class_list":["post-221614","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology","tag-500ton","tag-beams","tag-cranes","tag-final","tag-m30","tag-madrid","tag-night","tag-park","tag-piece","tag-places","tag-work"],"_links":{"self":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/221614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/comments?post=221614"}],"version-history":[{"count":1,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/221614\/revisions"}],"predecessor-version":[{"id":221616,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/221614\/revisions\/221616"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media\/221615"}],"wp:attachment":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media?parent=221614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/categories?post=221614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/tags?post=221614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}