{"id":210442,"date":"2026-03-17T09:14:46","date_gmt":"2026-03-17T09:14:46","guid":{"rendered":"https:\/\/teknomers.com\/en\/the-metro-has-been-dividing-rivas-for-decades-the-city-councils-plan-to-conceal-it-has-been-presented-to-madrid\/"},"modified":"2026-03-17T09:14:47","modified_gmt":"2026-03-17T09:14:47","slug":"the-metro-has-been-dividing-rivas-for-decades-the-city-councils-plan-to-conceal-it-has-been-presented-to-madrid","status":"publish","type":"post","link":"https:\/\/teknomers.com\/en\/the-metro-has-been-dividing-rivas-for-decades-the-city-councils-plan-to-conceal-it-has-been-presented-to-madrid\/","title":{"rendered":"The Metro Has Been Dividing Rivas for Decades: The City Council&#8217;s Plan to Conceal It Has Been Presented to Madrid"},"content":{"rendered":"\n<div>\n<h2>Rivas Vaciamadrid City Council Takes Steps to Cover Metro Line 9B<\/h2>\n<p>The Rivas Vaciamadrid City Council <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.rivasciudad.es\/noticias\/urbanismo-y-vivienda\/2026\/03\/11\/rivas-da-un-paso-decisivo-para-el-cubrimiento-de-la-linea-9b-y-pide-agilidad-a-la-comunidad-de-madrid\/862600271230\/\" target=\"_blank\">has registered<\/a> a significant project with the General Directorate of Infrastructure of the Community of Madrid to cover 2.5 kilometers of Metro Line 9B. This transformative initiative aims to reshape the urban layout of Rivas and reduce the physical division created by this transportation line.<\/p>\n<h3>Understanding the Project<\/h3>\n<p>The proposed project involves burying or covering the elevated section of Metro Line 9B, which stretches between the Cerro del Tel\u00e9grafo Sports Center and the Rivas Futura station. By covering this extensive 2.5-kilometer stretch, which is 30 meters wide, the City Council hopes to eliminate a substantial urban barrier that splits the municipality into two. This would not only enhance connectivity but also foster community cohesion.<\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\"><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<h3>Creating Green Spaces<\/h3>\n<p>An integral part of this initiative includes extending the Linear Park, which will provide a green corridor for public use. This area is expected to improve the quality of life for residents by offering more recreational spaces, thereby promoting outdoor activities and community gatherings. Additionally, plans include the construction of a fourth Metro station located on Jos\u00e9 Saramago Street, further improving public transportation access in the area.<\/p>\n<h3>Project Timeline<\/h3>\n<p>The City Council held a technical meeting with the General Directorate of Infrastructure on February 27, where they presented their proposals. The project was officially registered on March 4, creating a timeline where the Community of Madrid has three months to make a technical assessment of the project. The council has urged the regional administration for &#8220;agility&#8221; in processing this initiative, emphasizing its importance to the local community.<\/p>\n<h3>Political and Community Support<\/h3>\n<p>Despite previous statements from the Community of Madrid suggesting that the covering of this stretch of Metro is &#8220;not justified on a technical level,&#8221; the City Council maintains that extensive technical work supports the project&#8217;s feasibility. In a recent survey, 78% of Rivas residents acknowledged the importance of this project as part of their Rivas 2030 Urban Agenda, demonstrating strong community backing.<\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\">\n     <img loading=\"lazy\" decoding=\"async\" alt=\"&quot;We felt cheated&quot;. Even gas station owners are freaking out about the sudden, meteoric rise in oil\" width=\"375\" height=\"142\" src=\"https:\/\/teknomers.com\/en\/wp-content\/uploads\/2026\/03\/1773738886_822_The-Metro-Has-Been-Dividing-Rivas-for-Decades-The-City.jpeg\"\/>\n   <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<h3>The Path Forward<\/h3>\n<p>The next steps lie with the Community of Madrid, which is expected to provide a technical response by the end of June. This report will dictate whether the project proceeds, requires adjustments, or faces challenges, particularly regarding the planned new station. The Town Hall remains hopeful that the regional body will facilitate the advancement of this long-desired project, which is viewed as a vital step toward modernizing the urban landscape of Rivas.<\/p>\n<p>Ultimately, the fate of this project will have a crucial impact on Rivas, determining both its urban development and the quality of life for its residents in the years to come.<\/p>\n<p>Cover image | Google Maps<\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/teknomers.com\/category\/general\/\" rel=\"dofollow\">General News &#8211; 2<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rivas Vaciamadrid City Council Takes Steps to Cover Metro Line 9B The Rivas Vaciamadrid City Council has registered a significant project with the General Directorate of Infrastructure of the Community of Madrid to cover 2.5 kilometers of Metro Line 9B. This transformative initiative aims to reshape the urban layout of Rivas and reduce the physical [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":210443,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36399],"tags":[364,44535,8338,4496,3900,7494,1461,1482,2067,38606],"class_list":["post-210442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology","tag-city","tag-conceal","tag-councils","tag-decades","tag-dividing","tag-madrid","tag-metro","tag-plan","tag-presented","tag-rivas"],"_links":{"self":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/210442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/comments?post=210442"}],"version-history":[{"count":1,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/210442\/revisions"}],"predecessor-version":[{"id":210444,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/210442\/revisions\/210444"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media\/210443"}],"wp:attachment":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media?parent=210442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/categories?post=210442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/tags?post=210442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}