{"id":164110,"date":"2025-08-20T12:52:53","date_gmt":"2025-08-20T12:52:53","guid":{"rendered":"https:\/\/teknomers.com\/en\/adif-is-dealing-with-the-significant-obron-project-in-valencia-they-are-now-also-facing-a-gas-leak-and-desperate-neighbors\/"},"modified":"2025-08-20T12:52:54","modified_gmt":"2025-08-20T12:52:54","slug":"adif-is-dealing-with-the-significant-obron-project-in-valencia-they-are-now-also-facing-a-gas-leak-and-desperate-neighbors","status":"publish","type":"post","link":"https:\/\/teknomers.com\/en\/adif-is-dealing-with-the-significant-obron-project-in-valencia-they-are-now-also-facing-a-gas-leak-and-desperate-neighbors\/","title":{"rendered":"Adif is dealing with the significant &#8220;obr\u00f3n&#8221; project in Valencia. They are now also facing a gas leak and desperate neighbors."},"content":{"rendered":"\n<p>With <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/elpais.com\/espana\/comunidad-valenciana\/2021-07-29\/adif-inicia-el-proceso-para-soterrar-el-ferrocarril-hasta-el-acceso-a-las-estaciones-de-valencia.html\" target=\"_blank\">two years behind<\/a> and another <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.20minutos.es\/noticia\/5697140\/0\/puente-confirma-que-soterramiento-las-vias-valencia-estara-finalizado-2028\/\" target=\"_blank\">three years projected ahead<\/a>, Valencia is embarking on one of its most significant urban transformation projects surrounding its central park, adjacent to the Joaqu\u00edn Sorolla station. This project aims to convert the city\u2019s most vital mobility hub into a more accessible and integrated space. According to statements found on the project\u2019s official website, it represents \u201cthe project of greatest urban impact in the city.\u201d<\/p>\n<p><!-- BREAK 1 --> <\/p>\n<p>The scale of these reforms is immense and ambitious. In summary, the project entails creating a <strong>New high-speed rail access<\/strong> connecting Madrid-Valencia with the Mediterranean corridor. Both the conventional and high-speed rail lines will be buried, leading to the development of a new central station. While the exterior fa\u00e7ade will be preserved, the interior will be completely transformed into a vast intermodal station. This space will accommodate high-speed trains, conventional lines, subways, and buses, while also reforming areas dedicated to freight transport.<\/p>\n<p><!-- BREAK 2 --><\/p>\n<p>In terms of numbers, Valencia anticipates regaining a total of \u00a0230,000 square meters\u00a0 through this venture. Much of this recovered area will be dedicated to green spaces, which will enhance accessibility between neighborhoods currently separated by train tracks. The projected cost of the rail transformation alone is estimated at <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.valenciaextra.com\/es\/valencia\/playa-vias-divide-valencia-empezara-desaparecer-en-2025_566720_102.html\" target=\"_blank\">665 million euros<\/a>, with both Adif and Renfe expected to cover over 50% of this expense.<\/p>\n<p><!-- BREAK 3 -->  <\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\"><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p>The project is currently in an active phase. Dubbed the &#8220;Playground of Roads,&#8221; this expansive area utilized by trains reaching the station has been an imposing barrier. Work is underway to bury this zone, commencing with the excavation of a \u00a01.2-kilometer\u00a0 tunnel.<\/p>\n<p><!-- BREAK 4 --><\/p>\n<p>However, this new stage has not been without its complications.<\/p>\n<h2>A Gas Leak and Various Problems<\/h2>\n<p>Two years into the project, local residents are beginning to feel the adverse effects. While it is typical to encounter inconveniences during such endeavors, tension escalated when excavations by Adif led to a gas leak on Olta Street, which runs perpendicular to Garc\u00eda Lorca Boulevard.<\/p>\n<p><!-- BREAK 5 --><\/p>\n<p>The situation was deemed &#8220;controlled&#8221; after it was determined that a gas pipe had been damaged during the excavation. Adif officials emphasized to the newspaper <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.levante-emv.com\/valencia\/2025\/08\/19\/obron-tunel-ferroviario-provocado-fuga-120755550.html\" target=\"_blank\"><em>Levant<\/em><\/a> that there was no imminent risk to the public. Emergency protocols were activated, and rapid notifications were sent to first responders.<\/p>\n<p><!-- BREAK 6 --> <\/p>\n<p>On the day of the \u00a0incident\u00a0, crews worked tirelessly to restore service, which necessitated confining a nearby community for safety reasons.<\/p>\n<p><!-- BREAK 7 --><\/p>\n<p>Nonetheless, the gas leak has proven to be &#8220;the straw that broke the camel&#8217;s back,&#8221; as expressed by aggrieved residents who <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.levante-emv.com\/valencia\/2025\/08\/19\/fuga-gas-obliga-confinar-fincas-120754279.html\" target=\"_blank\">offered their testimonies to the local media<\/a>. They cite ongoing vehicle disruptions and the difficulty of conducting business due to persistent construction-related disturbances.<\/p>\n<p><!-- BREAK 8 --><\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\">\n     <img loading=\"lazy\" decoding=\"async\" alt=\"There is a youtuber broadcasting the Soterration works of the A-5 in Madrid. And there are thousands of people hooked\" width=\"375\" height=\"142\" src=\"https:\/\/teknomers.com\/en\/wp-content\/uploads\/2025\/08\/1755694373_703_Adif-is-dealing-with-the-significant-obron-project-in-Valencia.jpeg\"\/>\n    <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p>Residents also mentioned the increased frequency of power and water outages, with reports of homes sustaining structural damage. Such issues are far from unprecedented; previous projects in Valencia have similarly resulted in crack damage due to excavation activities.<\/p>\n<p><!-- BREAK 9 --><\/p>\n<p>For example, in Madrid, residents along the A-5 have experienced frequent service interruptions attributed to ongoing road construction. In nearby San Fernando de Henares, where Metro line expansion has caused severe structural damage, <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.diariodecoslada.es\/vecinos-de-san-fernando-de-henares-y-coslada-vuelven-a-las-calles-para-exigir-soluciones-ante-la-crisis-del-metro-l7b\/\" target=\"_blank\">residents have long reported<\/a> the destruction of their homes, with 73 buildings ultimately demolished due to serious structural issues linked to the ongoing works.<\/p>\n<p><!-- BREAK 10 --> <\/p>\n<p>Photo | <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/valenciaparquecentral.es\/sala-de-prensa\/imagenes#81-Canal-de-Acceso\" target=\"_blank\">Valencia Central Park<\/a><\/p>\n<p>In Xataka | Madrid faces a capital challenge with the underground of the A-5: living with a hell in the face of the promise of future success<\/p>\n<p><br \/>\n<br \/><a href=\"https:\/\/teknomers.com\/category\/general\/\" rel=\"dofollow\">General News &#8211; 2<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With two years behind and another three years projected ahead, Valencia is embarking on one of its most significant urban transformation projects surrounding its central park, adjacent to the Joaqu\u00edn Sorolla station. This project aims to convert the city\u2019s most vital mobility hub into a more accessible and integrated space. According to statements found on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":164111,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36399],"tags":[35761,12772,5911,14106,171,4728,1556,40854,3663,8831,20237],"class_list":["post-164110","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology","tag-adif","tag-dealing","tag-desperate","tag-facing","tag-gas","tag-leak","tag-neighbors","tag-obron","tag-project","tag-significant","tag-valencia"],"_links":{"self":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/164110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/comments?post=164110"}],"version-history":[{"count":0,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/164110\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media\/164111"}],"wp:attachment":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media?parent=164110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/categories?post=164110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/tags?post=164110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}