{"id":155923,"date":"2025-07-15T17:42:30","date_gmt":"2025-07-15T17:42:30","guid":{"rendered":"https:\/\/teknomers.com\/en\/you-are-setting-up-a-data-center-in-tents\/"},"modified":"2025-07-15T17:42:31","modified_gmt":"2025-07-15T17:42:31","slug":"you-are-setting-up-a-data-center-in-tents","status":"publish","type":"post","link":"https:\/\/teknomers.com\/en\/you-are-setting-up-a-data-center-in-tents\/","title":{"rendered":"You are setting up a data center in tents."},"content":{"rendered":"\n<h2>Mark Zuckerberg&#8217;s Bold Move: Building AI Data Centers in Tents<\/h2>\n<p>Mark Zuckerberg is on a mission to elevate his company, Meta, to new heights in the \u00a0race for artificial intelligence (AI)\u00a0. With his sights set on building a \u00a0superintelligence team\u00a0, Zuckerberg has amassed the talent needed to navigate this highly competitive field. However, talent acquisition is just one facet of his ambitious plan. The real challenge lies in harnessing substantial \u00a0computational power\u00a0 to facilitate groundbreaking AI developments. This urgency has led to a rather unconventional strategy: constructing data centers in \u00a0outdoor tents\u00a0.<\/p>\n<p><strong>As astonishing as it sounds<\/strong>, Meta&#8217;s desire for rapid progress is finely tuned to its unique operational rhythm, which involves erecting its data centers at unprecedented speeds. In a bid to bolster their computational capacity amidst pressing demands, outdoor tents have been employed as temporary, agile solutions. While this unconventional choice raises eyebrows, it is a calculated decision made to ensure that the \u00a0integration of the equipment\u00a0 does not compromise the system\u2019s energy efficiency and cooling sustainability. The decision to utilize tents, especially during summer, may seem counterproductive given the heat management challenges, yet this reflects Meta\u2019s willingness to take bold risks in pursuit of innovation.<\/p>\n<p><!-- BREAK 1 --><\/p>\n<h2>Zuckerberg Follows Musk&#8217;s Footsteps<\/h2>\n<p>The urgency behind Zuckerberg\u2019s tactics is reminiscent of a \u00a0rival in the AI arena\u00a0: Elon Musk. Musk previously captured headlines by installing an astounding 100,000 Nvidia GPUs in a mere 19 days, a feat that left executives such as Jensen Huang in awe. According to a report from <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/semianalysis.com\/2025\/07\/11\/meta-superintelligence-leadership-compute-talent-and-data\/#the-more-you-buy-the-more-you-save-obbb-edition\" target=\"_blank\">SEMIANALYSIS<\/a>, Zuckerberg&#8217;s hurried approach has been significantly influenced by Musk\u2019s rapid strides in AI, particularly with \u00a0XAI\u00a0 and \u00a0Tesla\u00a0. Facebook has a storied legacy of embracing a &#8220;move fast and break things&#8221; policy, and it appears that this philosophy remains deeply embedded within the company&#8217;s DNA, now echoing a similar sentiment found in the \u00a0OpenAI\u00a0 community.<\/p>\n<p><!-- BREAK 2 --><\/p>\n<div class=\"article-asset article-asset-normal article-asset-center\">\n<div class=\"desvio-container\">\n<div class=\"desvio\">\n<div class=\"desvio-figure js-desvio-figure\">\n<pre><code> &lt;img alt=\"In silence, the engineers specialized in AI are becoming the best paid workers in history\" width=\"375\" height=\"142\" src=\"https:\/\/i.blogs.es\/2bebac\/zuck\/375_142.jpeg\"\/&gt;<\/code><\/pre>\n<\/div>\n<\/div><\/div>\n<\/div>\n<h2>Meta\u2019s Grand Plan for Superintelligence<\/h2>\n<p>While the tents are erected, <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.threads.com\/@zuck\/post\/DMF6tMAxkX8?xmt=AQF0PFknknjj2sTT-0VcCdxZb0OQk9L6aZBzVNErWLupfA\" target=\"_blank\">Mark Zuckerberg officially announced<\/a> plans to invest \u00a0hundreds of billions\u00a0 of dollars into computational infrastructure aimed at developing superintelligence. The construction of two major data centers has been proposed. The first, named \u00a0Prometheus\u00a0, is set to go operational as early as next year. The second, \u00a0Hyperion\u00a0, aims to rival the size of Manhattan and is expected to have a staggering capacity of up to \u00a05 gigawatts\u00a0 over the next few years. The tents serve as interim setups until the permanent installations are ready. For context, no NVIDIA H100 and H200 operation clusters have exceeded \u00a0200 megawatts\u00a0 to date, according to SEMIANALYSIS.<\/p>\n<p><!-- BREAK 3 --><\/p>\n<div class=\"article-asset-image article-asset-normal article-asset-center\">\n<div class=\"asset-content\">\n<p>   <img decoding=\"async\" alt=\"Hyperion\" class=\"centro_sinmarco\" src=\"https:\/\/teknomers.com\/en\/wp-content\/uploads\/2025\/07\/You-are-setting-up-a-data-center-in-tents.jpeg\"\/><\/p>\n<pre><code>  &lt;\/div&gt;<\/code><\/pre>\n<\/div>\n<h2>Racing Against Time in AI<\/h2>\n<p>The context in which these developments are occurring is crucial. While Meta was once prominently positioned in the \u00a0AI race\u00a0, its focus on the \u00a0metaverse\u00a0 in recent years proved to be a massive financial drain. This dynamic shifted dramatically with the release of \u00a0Flame 4\u00a0, their latest major language model, which unfortunately failed to meet expectations. Competing technologies such as \u00a0O3\u00a0, \u00a0Claude 4\u00a0, and \u00a0Gemini 2.5 Pro\u00a0 quickly overshadowed Meta&#8217;s offerings. This awareness of waning competitiveness has led Meta to shift its default programming AI from the underwhelming \u00a0Code Flame\u00a0 to \u00a0Claude\u00a0, representing a significant pivot in strategy.<\/p>\n<p><!-- BREAK 4 --><\/p>\n<p><strong>Beyond Talent: The Race for Supercomputing Resources<\/strong>. Meta&#8217;s ambitious plans demonstrate that \u00a0talent acquisition\u00a0 alone will not suffice in the quest for AI supremacy. Zuckerberg has successfully recruited some of the top minds in the industry, but that is only part of the equation. Moreover, Meta&#8217;s acquisition of \u00a0Scale AI\u00a0 has bolstered their data quality, providing another layer of competitive advantage. To complete the trifecta, however, immense computational power is necessary. This is where the newly constructed data centers come into play. Furthermore, Meta is exploring \u00a0nuclear energy\u00a0 options as they aim to enhance their energy efficiency, even proposing a facility that leverages underground geothermal heat.<\/p>\n<p><!-- BREAK 5 --><\/p>\n<p>The strategy unfolds with a multi-faceted approach, centered not only on acquiring the best talent and models but also on securing substantial computational resources and sustainable energy solutions. It\u2019s a race against time, and the stakes have never been higher.<\/p>\n<p>Images | <a rel=\"noopener, noreferrer nofollow\" href=\"https:\/\/www.facebook.com\/photo\/?fbid=10115852257964761&amp;set=a.743613136151\" data-id=\"noopener, noreferrer\" target=\"_blank\">Mark Zuckerberg<\/a> | Meta<\/p>\n<p>In Xataka, we delve deeper into the staggering amounts being allocated by Big Tech for data centers, revealing just how critical these investments are for the future of technology.<\/p>\n<p><br \/>\n<br \/><a href=\"https:\/\/teknomers.com\/category\/general\/\" rel=\"dofollow\">General News &#8211; 2<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mark Zuckerberg&#8217;s Bold Move: Building AI Data Centers in Tents Mark Zuckerberg is on a mission to elevate his company, Meta, to new heights in the \u00a0race for artificial intelligence (AI)\u00a0. With his sights set on building a \u00a0superintelligence team\u00a0, Zuckerberg has amassed the talent needed to navigate this highly competitive field. However, talent acquisition [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155924,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36399],"tags":[927,4898,7930,12106],"class_list":["post-155923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology","tag-center","tag-data","tag-setting","tag-tents"],"_links":{"self":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/155923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/comments?post=155923"}],"version-history":[{"count":0,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/posts\/155923\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media\/155924"}],"wp:attachment":[{"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/media?parent=155923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/categories?post=155923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teknomers.com\/en\/wp-json\/wp\/v2\/tags?post=155923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}